The Football pitch was underwater and so was the Jetty so my usual busy Sunday Schedule was washed away. A couple of hours in the workshop and a lot of apertures were cut into the progressing deck.
This is the underside of the deck with two access apertures yet to be cut out
Deck with mast, fin case in position and access apertures cut out, the slots each side of the pot recess is to aid opening and help any water to drain away
Kicker well and bulkhead in position